Join up the dots and see what you get

When I was a lad I was a big fan of the puzzle page in the children’s comics of the day. I remember one particular type of puzzle that was a jumble of numbered dots: only when you joined the dots in sequence by straight-line segments did a picture emerge. Whilst this may not have posed much of an intellectual challenge, it was very satisfying to see a picture gradually emerging from the chaos of dots and numbers. I don’t know whether these puzzles have survived the technological revolution that has meant that the kids of today have many more sophisticated distractions, but I hope so. Certainly, to judge by a drawing that has recently come into my possession, HS2 Ltd might have taken some inspiration from them.

The drawing to which I refer came to me within the Promoter’s evidence pack provided for the Lords Select Committee hearing of the petition by Cubbington Parish Council, for which I was acting as Roll B Agent, and it depicts the operational noise contours that will affect the Parish. It bears the Promoter’s reference P1191 12. Since the Cubbington PC petition did not raise noise as an issue, I assume that a similar drawing will be standard issue to all petitioners irrespective of whether they have petitioned against noise or not. The drawing reference number is the same as the equivalent drawing that was included in Volume 5 of the Environmental Statement (SV-02-046). I have reproduced a section of this drawing below.

Source: HS2 Ltd

Source: HS2 Ltd

The new version of SV-02-046 appears identical to the original version in the Environmental Statement (ES) with one small change; some of the dots indicating locations where operational noise assessments have been made now have squares drawn around them. The drawing legend informs that these squares indicate that these particular assessment locations have LAMax in excess of, or equal to, 60dB, measured at the façade of a building. A further note advises that the level that has been calculated is for HS2 train noise only, and the calculated free-field levels tabulated in the ES have been converted to façade levels by adding a 2.5dB correction – so a level of 57.5dB LAMax in the ES tabulation comes out at 60dB façade.

Those of you who have been paying attention over the past months will appreciate that what the drawing is showing is the extent of operational noise from HS2 trains that is predicted to equal or exceed the lowest observed adverse effect level (LOAEL) determined in three ways. The full line enclosing the grey shaded area is a contour for 40dB LpAeq,night, which has been specified by HS2 Ltd as LOAEL night using the equivalent continuous sound level methodology for calculating noise. A reasonable simplifying assumption has been made that this contour also represents 50dB LpAeq,day. The squares are an attempt to indicate the limits of the LOAEL contour when considering the noise from a single train pass-by. This lowest adverse effect level has been determined by considering the sleep disturbance effects of each train pass-by, and the health effects arising therefrom, and so is applicable to the night hours only; as I explained above, this LOAEL has been set by HS2 Ltd at 60dB façade (57.5dB free-field).

What we can’t tell precisely from the HS2 Ltd version of a join up the dots puzzle is exactly where the 60dB LAMax contour should be drawn. All that we can say is that it will lie somewhere between each dot with a square around it and the nearest dot without a square that is further away from the trackline.

So these squares represent HS2 Ltd’s response to its acceptance that the noise maps were deficient in only showing the limits for LOAEL calculated in two out of the three possible ways. As I was told at the Kenilworth information event in late April this year, and reported in my blog What a turn-up (and turn-out)! (posted 16 May 2016), we have not been given the LAMax LOAEL in contour form, and so the depiction is inconsistent with the way that the two equivalent continuous sound level LOAELs have been shown.

What is abundantly clear from the location of the squares is that the area over which operational peak noise from a single train pass-by is predicted to exceed LOAEL is much larger than when LOAEL is defined in terms of the equivalent continuous sound level.

Take for example the bottom-most and most right square on the map reproduced above, which happens to be within fifty metres of where I live. This dot/square is just about twice as far from the track centreline as the 40dB LOAEL contour. This hardly comes as a surprise, since it was pointed out in evidence given to the Commons Select Committee by the Promoter’s noise expert, Rupert Thornely-Taylor, a number of times, that the LAMax LOAEL contour defines a larger area, as I reported in my blog I’m sorry, what did you say? (posted 14 Nov 2015).

It is important to bear in mind that this isn’t a trivial matter. LOAEL is an important threshold, because as well as demarcating the area where HS2 noise may lead to adverse effects on health and wellbeing being observed it also designates the point at which the developer is required to “mitigate and minimise adverse impacts on health and quality of life” by the Noise Policy Statement for England.

What is clear is that the noise contour maps that the Promoter produced as evidence of noise effects throughout the Commons Select Committee process understated the true effects of HS2 operations, and it is only now, more than thirty months after the ES was first published and almost two years after the first petitioners were heard, that maps that show the true picture are being presented in evidence.

You might think that this clean breast has taken far too long, and has come far too late to influence the Bill process – you might very well be right.

4 responses to this post.

  1. Posted by LesF on July 27, 2016 at 10:33 am

    This revelation invites a lot of questions.
    If the predicted noise is from a single train, what is the noise level when 2 trains pass?
    Why consider the equivalent continuous noise level when the noise from the railway will be intermittent, for a few seconds about every 90 seconds? Continuous noise is more appropriate to a motorway. The peak noise level should be considered for an intermittent noise.
    If the spot sound levels exceed 60dB, what is the actual value?
    How can the noise be mitigated without enclosing the railway? It’s already in a cutting. Earplugs? Run the trains at lower speed? Relocate Cubbington? Or relocate HS2 to a museum where it belongs.
    The noise will be much worse around an elevated railway.
    I hope you will get your MP’s help with this.

    Reply

    • Taking your comments in order Les.
      Two trains passing only adds 3dB in the worst case, and the shielding that each train provides to the other means that, in practice, the increase will be less.
      Considering the pass-by noise alone means that the frequency of train pass-bys, which surely has an influence on the effects on health and wellbeing, is not taken into account. Whilst I agree that the equivalent continuous sound level fits better with a motorway than hsr, what is required is to consider both peak and equivalent continuous sound level paramaters, which is what HS2 Ltd is doing.
      The predicted peak noise levels at each assessment point are all tabulated in the SV-004_0xy appendices in Appendix 5 of the Environmental Statement.
      HS2 Ltd has suggested reducing speed at night to provide mitigation, and I will be looking at this soon.

      Reply

  2. HS2 announced a new route proposal for Phase 2b, Sheffield to Leeds on 7th July 2016 and their plans for the rural village of Crofton near Wakefield are quite simply horrendous. They propose to construct two 13 to 14 metre high elevated high speed tracks on a vertical concrete structure, alongside 3 lower level depot feed tracks and a 1.5 mile long rolling stock depot, all in green belt land encircling our rural village. We are at a very early in stage in coming to terms with the implications of this proposal and to assist me in investigating the issue of noise and raising awareness in our community I would be very grateful if you could advise of the distance of the dot in square 213764 to the centre of the track. I fully appreciate that the noise levels / contours that we would experience at Crofton would be different to those at Cubbington for a number of reasons.

    Reply

    • It’s good to welcome you to the site Simon, although I am truly sorry for the reason for your interest in HS2. The situation that you describe sounds really dreadful. To answer your question, assessment point 213764 is about 450 metres from track centreline. The track is down 5 metres in a cutting at the point where the road is shown crossing it in the plan that I reproduced in my blog. The depth of the cutting is reducing as you move leftwards (northwest) to reach grade at about 1km further along the line (towards Birmingham Interchange). The maximum level of a single train passby, for the noise-reduced HS2 design, has been assessed as 59dB(A) at 213764, i.e. about 2dB above LOAEL.